Project Owner

Illinois Department of Transportation (IDOT)

Client

TranSystems Corporation

Services Provided

Phase II Design Services

Location

Will County, IL

Year of Construction

2020-Ongoing

I-80 from Houbolt Road to West of Center Street and the Larkin Avenue Interchange

HBM Engineering Served as a sub-consultant  to TranSystems for the I-80 Larkin Avenue Interchange /I-80 Houbolt Road to West of Center Street Reconstruction and Interchange Enhancement Project.

 

Mainline Contract No. 3 (ML-3) – I-80: Houbolt Road to West of Center Street

HBM Engineering Group completed Phase II Engineering Services for the reconstruction of I-80 from Houbolt Road to west of Center Street (ML-3). Covering approximately 4.4 miles, this project is strategically designed to address critical infrastructure needs and seamlessly integrate with the City of Joliet’s Houbolt Road improvements.

  • Bridge reconstruction and rehabilitation at key locations, ensuring enhanced functionality and longevity.
  • EB and WB I-80 over Houbolt Road – Bridge Widening and Rehabilitation
  • EB and WB I-80 over Joliet Junction Trail – Bridge Replacement
  • EB and WB I-80 over Midland Avenue – Bridge Widening and Rehabilitation

Interchange Contract No. 2 (INT-2) – Larkin Avenue Interchange at I-80

Phase II Engineering Services included the reconstruction of the Larkin Avenue Interchange at I-80 (INT-2). This project is a critical component in optimizing this portion of the system.

  • Bridge rehabilitation at Larkin Avenue over I-80, enhancing safety and functionality.

 

HBM’s Scope:

Mainline Contract No. 3 (ML-3) – I-80: Houbolt Road to West of Center Street

HBM Engineering’s portion was development of noise wall and sign structure plans for the mainline contract. Our approach encompassed roadway reconstruction, drainage, culvert replacement, retaining wall construction, utility coordination, traffic control and protection, signing, and pavement markings. Our commitment to excellence is reflected in Phase II engineering services including preparation of contract plans, special provisions, and estimates.

Interchange Contract No. 2 (INT-2) – Larkin Avenue Interchange at I-80

Our expertise extended to the development of noise walls and sign structure plans for the interchange contract. Collaborative efforts encompass ramp reconstruction, drainage, culvert replacement, retaining wall construction, utility coordination, traffic control and protection, signing, and pavement markings. Phase II engineering services also included preparing contract plans, special provisions, and estimates.

Achievements:

  • Successful completion of extensive reconstruction for I-80 ML-3 and Larkin Avenue Interchange.
  • Critical enhancements to bridges for improved safety and longevity.
  • Comprehensive scope of work covering roadway, drainage, utilities, and traffic management.
  • Commitment to excellence demonstrated through meticulous planning and engineering services.

This project stands as a testament to HBM Engineering Group's capabilities in executing large-scale infrastructure improvements, ensuring the longevity, functionality, and safety of vital transportation networks.