Illinois Department of Transportation (IDOT)
GSG Consultants, Inc.
Phase III Services Construction Inspection
I-55, I-80 to Weber Rd.
2021-Ongoing
I-55 South of I-80 to South of Weber Rd – Bridge Preservation, Phase III Project
Description of Project:
The I-55 South of I-80 to South of Weber Rd Bridge Preservation, Phase III Project involves critical construction and improvement efforts along I-55, focusing on the stretch from south of I-80 to south of Weber Rd. The primary components of the project encompass a range of bridge preservation activities to enhance the overall condition and longevity of the infrastructure.
HBM’s Scope:
HBM, in collaboration with GSG, is actively engaged in providing construction inspection services, overseeing a diverse set of tasks aimed at ensuring the successful implementation of the project. The scope of work includes:
- Supervision of the construction workers – ensuring that they follow safety and work guidelines as stipulated in their contract.
- Inspection of the material used for construction as per IDOT’s specifications.
- Report directly the status of the project to the Resident Engineer
- Maintain a daily record of the construction activities and progress by doing field measurements and/or visual inspections.
- Routinely inspect the construction site to make sure all activities are going smoothly.
- Assist in the preparation of upcoming tasks by coordinating with the contractors in order to ensure a smooth transition.
Bridge Deck Enhancements:
- Application of bridge deck latex concrete overlay to enhance durability and performance.
- Replacement and repairs of bridge joints to address wear and tear.
- Bridge deck grooving for improved skid resistance.
Approach Slab and Pavement Upgrades:
- Repair of approach slabs to ensure a smooth transition onto bridges.
- Bridge deck scarification for surface preparation.
HMA Shoulder Reconstruction:
- Reconstruction of Hot Mix Asphalt (HMA) shoulders, necessitated by the implementation of the Maintenance of Traffic (MOT) plan.
Pavement Patching and Overlay:
- Longitudinal joint removal and pavement patching to address pavement irregularities.
- Application of Stone Matrix Asphalt (SMA) Mix “F” for approach slab overlay and butt joint enhancement.
- Full-depth patching into asphalt and concrete bases, ensuring structural integrity.
Traffic Control and Marking:
- Implementation of effective traffic control measures to facilitate construction activities.
- Pavement marking to enhance road visibility and safety.
Construction Inspection Services:
- Supervision of construction workers to enforce safety and work guidelines outlined in the contract.
- Inspection of materials used, ensuring compliance with IDOT specifications.
- Reporting project status directly to the Resident Engineer.
- Maintenance of a daily record of construction activities, including field measurements and visual inspections.
- Routine inspections of the construction site to ensure smooth progress.
- Coordination with contractors for upcoming tasks to facilitate seamless transitions.