Skip to main content

Civil · Transportation · Feasibility

Interchange Reconstruction of IL 38 over I-39

Rochelle, IL

Client
Christopher B. Burke Engineering, Ltd. (CBBEL)
Owner
Illinois Department of Transportation (IDOT)
Location
Rochelle, IL
Preferred alternative exhibit for the IL 38 / I-39 interchange reconstruction, showing the diverging diamond interchange, multi-use path, culvert repair, and intersection improvements near Rochelle

Project Overview

Description

HBM provided multidisciplinary engineering services for the reconstruction and rehabilitation of the IL 38 interchange with I-39 east of Rochelle, Illinois. The project limits extended from Dement Road to approximately 0.5 miles west of Mulford Road and included improvements to the interchange, IL 38 roadway, drainage facilities, culverts, signing, pavement markings, and associated transportation infrastructure. Developed to address existing structural conditions, improve interchange and roadway geometrics, accommodate projected traffic demand, and enhance safety, the project centered on the team's completed Phase I design report and plans for converting the IL 38/I-39 cloverleaf interchange into a diverging diamond interchange (DDI).

HBM's Scope

Scope of Work

  • Phase I: evaluation of existing bridge and culvert conditions, including a Culvert Condition Report for SN 071-1196
  • Phase I: interchange and roadway geometric studies — widening, turn lanes, and profile modifications
  • Phase I: drainage and hydraulic evaluations with development of culvert improvement alternatives
  • Phase I: TSL drawings, pavement design, geotechnical investigations, and soil/ground-condition evaluations
  • Phase I: utility coordination, environmental coordination, ADA/bicycle/pedestrian accommodation evaluations, and preliminary cost estimates
  • Phase II: pavement marking plans, signing removal plans, sign panel design, and sign elevation plans
  • Phase II: structural design and contract plans for the culvert repair and extension of SN 071-1196
  • Phase II: structural design and detailing of sign structures, with schedules of quantities and supporting contract documentation

Highlights

Project Highlights

  • Conversion of the IL 38/I-39 cloverleaf interchange to a diverging diamond interchange (DDI)
  • Complete Phase I design report and plans through Phase II contract documents
  • Culvert repair and extension design for SN 071-1196 beneath IL 38

Services Provided

Phase I & Phase II Engineering Services

Primary Discipline

Transportation Engineering

Categories

Ready to work together?